for those interested expansion of camp at Area C going ahead and a 1000 man camp still on track at newman. need to build a 250 man camp for the bigger one. averaging 1.6 million tonnes a month out of Area C
for those interested expansion of camp at Area C going ahead and...
Add to My Watchlist
What is My Watchlist?