"The rig up operations of DHS Rig 1 are complete on Australia II 12KA 6 #1-29, and the rig was accepted at 1800 hours on 16 November. Current operations include testing the blow out preventer, and preparing to drill the surface casing shoe."
Could get a mention that Australia II 12KA 6 #1-29 drilling has progress towards target vertical core destination.