niclou
all imho, and i reiterate all imho...
i strike out what i think is correct...1. Ground and down-hole EM surveys in progress at Guchab2. RC drilling at Kaskara proving effective3. Significant upgrades to roads4. Guchab proving significant intercepts close to surface5. "Final stages of its evaluation of a number of other drilling contractors as well as the possible purchase of its own diamond drill rig" as at Dec 116. Kaskara as at Dec 11 had "Samples from ten of those holes are in the lab (results for three holes have been received) and the remaining holes are either in transit to the lab or are in the process of being sampled."7. "RC is proving an effective technique to test the mineralisation at Kaskara, with the drilling programme
ongoing."8. "Sabre’s drilling programme will continue up until Christmas, when the field team will take a short
break, before resuming the exploration programme in mid-January 2013. The Company is in the final stages of selecting an alternative contractor to undertaking the diamond drilling at Guchab, which will most likely also include the purchase of its own diamond drill rig."
- Forums
- ASX - By Stock
- SBR
- expedite that new rig and crew
expedite that new rig and crew , page-22
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.5¢ |
Change
-0.001(6.25%) |
Mkt cap ! $5.894M |
Open | High | Low | Value | Volume |
1.6¢ | 1.6¢ | 1.5¢ | $4.579K | 302.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 334776 | 1.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.6¢ | 349703 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 334776 | 0.015 |
2 | 550000 | 0.014 |
3 | 471492 | 0.013 |
1 | 50000 | 0.012 |
1 | 90999 | 0.011 |
Price($) | Vol. | No. |
---|---|---|
0.016 | 349703 | 1 |
0.017 | 200000 | 1 |
0.018 | 187001 | 1 |
0.019 | 20000 | 1 |
0.020 | 311324 | 4 |
Last trade - 15.52pm 30/09/2024 (20 minute delay) ? |
Featured News
SBR (ASX) Chart |