SBR 8.33% 1.3¢ sabre resources limited

expedite that new rig and crew , page-22

  1. 8,328 Posts.
    lightbulb Created with Sketch. 186
    niclou

    all imho, and i reiterate all imho...

    i strike out what i think is correct...

    1. Ground and down-hole EM surveys in progress at Guchab

    2. RC drilling at Kaskara proving effective

    3. Significant upgrades to roads

    4. Guchab proving significant intercepts close to surface

    5. "Final stages of its evaluation of a number of other drilling contractors as well as the possible purchase of its own diamond drill rig" as at Dec 11

    6. Kaskara as at Dec 11 had "Samples from ten of those holes are in the lab (results for three holes have been received) and the remaining holes are either in transit to the lab or are in the process of being sampled."

    7. "RC is proving an effective technique to test the mineralisation at Kaskara, with the drilling programme
    ongoing."


    8. "Sabre’s drilling programme will continue up until Christmas, when the field team will take a short
    break, before resuming the exploration programme in mid-January 2013. The Company is in the final stages of selecting an alternative contractor to undertaking the diamond drilling at Guchab, which will most likely also include the purchase of its own diamond drill rig."
 
watchlist Created with Sketch. Add SBR (ASX) to my watchlist
(20min delay)
Last
1.3¢
Change
0.001(8.33%)
Mkt cap ! $5.108M
Open High Low Value Volume
1.3¢ 1.3¢ 1.3¢ $3.52K 270.7K

Buyers (Bids)

No. Vol. Price($)
1 1750 1.3¢
 

Sellers (Offers)

Price($) Vol. No.
1.5¢ 53804 2
View Market Depth
Last trade - 12.51pm 22/08/2024 (20 minute delay) ?
SBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.