I posted only the production test of 26th April 2016. The Sands you refer to are below the Lower D Sands but did not mention being tested so I would assume the "subject to production test" was abandoned prior the testing commencing. The phrases " thinner sandstone units" and " lower gas pays zones" could have something to do with it.
Have a look at the presentation of March 2015 (page 11). Could possibly be the "LC 1 Sands" you refer to.
N.B. The Drill report styles of GGW-1 and RG-1 should be reintroduced (even after the blackout period would be fine) .
EGO Price at posting:
40.5¢ Sentiment: Hold Disclosure: Held