Things required for successful gas flows in CSG fields..Successful dewatering - TICKSuitable Permeability of the seam - TICKFavourable gas content/m3 - TICKPurity above 85% - TICKQuality equipment, especially downhole pumping and pressure measuring instruments for well pressures. - TICMExperienced geological engineering and calculations for well management plans. - TICKPatient and planned dewatering program to not damage the coal bed - Hopefully TICK
Now to manage all of that, experienced and successful engineering and geoscientific team and well design and operators. - TICK
A few ounces of luck from the CSG gods - Fingers Crossed.
We have what we need. It's now a time and patience game to manage the well pressures and gas flows. A tricky balancing act. I can't imagine we could get anyone else who could have had more experience and success in doing this than the team we already have.
- Forums
- ASX - By Stock
- EXR
- EXR Trading 2023
EXR Trading 2023, page-415
-
- There are more pages in this discussion • 1,210 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EXR (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.5¢ |
Change
-0.001(1.79%) |
Mkt cap ! $65.82M |
Open | High | Low | Value | Volume |
5.6¢ | 5.7¢ | 5.3¢ | $112.5K | 2.049M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 18001 | 5.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 167495 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 18001 | 0.054 |
3 | 111283 | 0.053 |
8 | 864497 | 0.052 |
12 | 460778 | 0.051 |
16 | 1244076 | 0.050 |
Price($) | Vol. | No. |
---|---|---|
0.055 | 167495 | 3 |
0.056 | 152631 | 2 |
0.057 | 102000 | 2 |
0.058 | 587867 | 3 |
0.059 | 525485 | 4 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
EXR (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online