HFR 1.69% 30.0¢ highfield resources limited

External emergency plan for category A mining waste facilities of the “Muga” mining project, in Sangüesa

  1. 82 Posts.
    lightbulb Created with Sketch. 7
    External emergency plan for category A mining waste facilities of the “Muga” mining project, in Sangüesa
    Plan de emergencia exterior de las instalaciones de residuos mineros de categoría A del proyecto minero “Muga”, en Sangüesa

    CIVIL PROTECTION AND EMERGENCIES SERVICE. GENERAL DIRECTORATE OF INTERIOR In application of Royal Decree 975/2009, of June 12, on waste management from extractive industries and the protection and rehabilitation of the area affected by mining activities, the interested public is informed that the external emergency plan is being drawn up associated with the category A mining waste facilities of the “Muga” mining project, in Sangüesa, promoted by Geoalcali, SL

    https://gobiernoabierto.navarra.es/es/participacion/procesos/plan-emergencia-exterior-instalaciones-residuos-mineros-categoria-a-proyecto-minero-muga-sanguesa

    Regards
    Ignacio
 
watchlist Created with Sketch. Add HFR (ASX) to my watchlist
(20min delay)
Last
30.0¢
Change
0.005(1.69%)
Mkt cap ! $117.6M
Open High Low Value Volume
30.0¢ 32.0¢ 30.0¢ $43.35K 139.2K

Buyers (Bids)

No. Vol. Price($)
1 1999 30.0¢
 

Sellers (Offers)

Price($) Vol. No.
31.0¢ 25231 1
View Market Depth
Last trade - 16.10pm 03/05/2024 (20 minute delay) ?
Last
30.0¢
  Change
0.005 ( 0.00 %)
Open High Low Volume
30.5¢ 32.0¢ 30.0¢ 29701
Last updated 15.56pm 03/05/2024 ?
HFR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.