PCL 6.25% 1.7¢ pancontinental energy nl

Exxon to expand footprint in Namibia, page-16

  1. 559 Posts.
    lightbulb Created with Sketch. 93
    Venus still on for this year, Maersk and Total still in negotiations and yet to start drilling the Angola block 48 well

    I do know they have loaded the riser equipment for the well

    As said before Total are also still in negotiations with Seadrill regarding the West Gemini, which is also on long term contract and "may" drill Venus if Voyager is going to be delayed
    GBP has de-listed from the ASX and the sp has risen substantially since, as talk of corporate activity may be coming soon. They have released a new presentation, first since 2015 and have announced a new Nomad and sole broker

    http://www.globalpetroleum.com.au/uploads/files/reports/20-07-20-gbp-corporate-presentation-v2-1595398978.pdf

    The common factor in Namibian blocks, is the size of the potential prize
 
watchlist Created with Sketch. Add PCL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.