MAY 4.35% 2.2¢ melbana energy limited

Straight after flow testing which should be 4 to 5 weeks from...

  1. 341 Posts.
    lightbulb Created with Sketch. 96
    Straight after flow testing which should be 4 to 5 weeks from spudding A2. Production by end of March early April is a reasonable expectation IMO.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.