ECT 50.0% 0.3¢ environmental clean technologies limited.

$2?You are not going to get skilled engineers working for that...

  1. 11,546 Posts.
    $2?

    You are not going to get skilled engineers working for that much, if they have to go to indo they will still get paid OZ rates plus bonuses.

    Laborers are a different story if that was your point.

    But you still need to build a pilot plant to test all the processes and technical aspects as well as general engineering..etc etc

    It can all be done at a cost, however it makes more sense to build one eventually in SE asia near a port facility or rail facility in the LT or maybe Vietnam.

 
watchlist Created with Sketch. Add ECT (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.001(50.0%)
Mkt cap ! $7.929M
Open High Low Value Volume
0.3¢ 0.3¢ 0.3¢ $620 218.0K

Buyers (Bids)

No. Vol. Price($)
56 28292481 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 11891216 23
View Market Depth
Last trade - 16.10pm 05/09/2024 (20 minute delay) ?
ECT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.