RFX 0.00% 9.7¢ redflow limited

factory expansion, page-2

  1. 134 Posts.
    lightbulb Created with Sketch. 30
    I agree with you. The time consuming part of setting up a production line isn't the equipment. It's the processes and the training. The first line may have taken six months to build but the second, third etc will be much much quicker and easier and mostly just a matter of space.
 
watchlist Created with Sketch. Add RFX (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.