CHN 0.69% $1.43 chalice mining limited

Fair Price for CHN with current resource ?, page-255

  1. 300 Posts.
    lightbulb Created with Sketch. 69
    69.2Mt @ 2.5% palladium sounds a bit optimistic...maybe this old article from April was written in double-Deutsch?

    Pretty sure you are permitted to do a DCF if it's in double-deutsch even if you don't start with a JORC 2012 resource...lol.

    Think that Hayden Bairstow from Macquarie and their investors will be very disappointed with the upcoming maiden resource estimate for Julimar.

    High-grade lode structures at Julimar appear angled @ ~45 degrees to the current drill orientation thus increasing the actual true thickness of reported primary intersections by a factor of 1.3-1.4 (same problem exists for flat, saprolite results).

    Furthermore, the number of lodes reported by CHN (11) appears grossly exaggerated given offset of primary sulfide concentrations either side of north-south-trending dolerite dykes.

    There are only five primary lodes separated by 10-15% barren (post-mineralisation) dolerite based on my interpretation of drilling to date.

    This downgrades current analyst volume guestimates of mineralisation by more than 50%.

    Lastly, continuity into the area of state forest (Hartog), based upon Airborne EM, is not supported by surface geochemistry.

    P
 
watchlist Created with Sketch. Add CHN (ASX) to my watchlist
(20min delay)
Last
$1.43
Change
-0.010(0.69%)
Mkt cap ! $556.2M
Open High Low Value Volume
$1.48 $1.55 $1.40 $8.492M 5.769M

Buyers (Bids)

No. Vol. Price($)
4 81453 $1.43
 

Sellers (Offers)

Price($) Vol. No.
$1.44 6938 3
View Market Depth
Last trade - 16.10pm 10/05/2024 (20 minute delay) ?
Last
$1.44
  Change
-0.010 ( 1.39 %)
Open High Low Volume
$1.49 $1.55 $1.40 1192989
Last updated 15.59pm 10/05/2024 ?
CHN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.