PGM platina resources limited

Sorry about the formatting, but happy birthday Oly, looks like...

  1. 8,355 Posts.
    lightbulb Created with Sketch. 240

    Sorry about the formatting, but happy birthday Oly, looks like some extra icing for you this year.

    TCG

    ASX/Media Release – 7 October 2009
    SKAERGAARD GOLD-PGM PROJECT MOVES TO NEXT
    STAGE FOLLOWING POSITIVE SCOPING STUDY REVIEW
    KEY FOCUS ON DEFINING HIGH-GRADE GOLD ZONE AS PART OF ONGOING PREFEASIBILITY
    STUDY
    KEY POINTS
    • Positive Scoping Study Review completed by international engineering company
    GRD Minproc.
    • Conceptual underground mine development of 2.4Mtpa with operating costs
    ranging from US$49-81/t.
    • Excellent bench-scale metallurgical recoveries of gold, palladium and platinum
    achieved from bulk samples – up to 92.7% gold recovery via flotation.
    • Compelling evidence suggesting a potentially higher-grade gold zone (>4g/t Au +
    PGM) identified by AMC Consultants, who contributed to the study, within the
    previously defined Gold Zone – to be targeted by key 6,000m diamond drilling
    program in 2010.
    • Pre-Feasibility Study to continue with targeted completion by December 2011.
    International precious metals explorer Platina Resources Limited (ASX: PGM) is pleased to
    advise that it has completed a positive Independent Scoping Study Review of its 100%-owned
    Skaergaard Gold and Platinum Group Metals (PGM) Project in Greenland, paving the
    way for the next stage of evaluation and development of the multi-million ounce deposit to
    proceed.
    The Scoping Study Review, which was conducted by the Brisbane office of international
    engineering company GRD Minproc, resulted in some important positive recommendations
    after its review of the technical viability of a conceptual 2.4 million tonne per annum
    (Mtpa) underground mine development. In particular, the Study by GRD Minproc reported
    some highly promising results from bulk metallurgical investigations.
    The Study focused on the Gold Zone within the Skaergaard deposit for which an Inferred
    Resource totalling 106.6 million tonnes grading 1.68g/t gold and 0.64g/t platinum +
    palladium for 5.77 million ounces of contained gold, 2.03 million ounces of contained
    palladium and 0.17 million ounces of contained platinum has been previously reported in
    accordance with the JORC Code.
    Based on the key recommendations in the AMC Consultants geological study, Platina
    Resources Limited (Platina) intends to move forward with a 6,000 metre diamond drilling
    program to be completed next year targeting a potential high-grade gold zone within the Skaergaard deposit. The Company then intends to proceed with a detailed Pre-Feasibility
    Study for completion by December 2011 that will include a second drilling program designed
    to progress the area of interest to Indicated Resource. Platina will progress the Pre-Feasibility
    Study to a very high standard and level of detail to facilitate an efficient and rapid transition
    to the Definitive Feasibility Study (DFS) stage.
    It is envisaged that this extensive higher grade zone, comprising material which could contain
    combined grades of +4g/t Au + PGM (platinum group metals), would provide a strong
    foundation to underpin a robust, long-life mining operation.
    The Skaergaard Project is at the forefront of a new generation of significant mineral projects
    in Greenland, which is considered to be one of the final frontiers for the discovery of new
    world-class mineral deposits globally. The Project is located on Greenland’s East Coast,
    approximately 400km west of geothermal power-rich Iceland. Infrastructure on site includes a
    20-person accommodation village and 600 metre airstrip.
    Commenting on the announcement, Platina’s Managing Director, Mr Rob Mosig, said: “We
    are very pleased with the outcomes of this interim Scoping Study Review, which has further
    increased our confidence in the quality of the Skaergaard Project and its potential to deliver
    an outstanding international production opportunity for the Company.
    In addition to the outstanding results from metallurgical test work – which are amongst the
    best reviewed by GRD Minproc – one of the key recommendations moving forward is the
    importance of the higher-grade area within the Gold Zone on the Western side of the
    Skaergaard Intrusion, which we expect will hold the key to development of this Project,” he
    said. “This will form the focus of a landmark drilling program commencing next year.”
    Key Study Findings
    The 2009 Scoping Study Review included a review of the 2008 Scoping Study completed by
    SRK Consulting Pty Ltd, and focused primarily on a review of the Inferred Resource
    estimate, geological and assay database, advice on the proposed design of the 2010 drilling
    program, review and comment on the most suitable mining method, metallurgical test work,
    alternate process routes, as well as a long-term development plan and schedule. A key focus
    of the review was to enhance the understanding of the Skaergaard Gold Zone and evaluate the
    optimum mining method for this Zone.
    The Study resulted in a number of positive recommendations, with the following important
    conclusions:
    • compelling historical drilling and assay evidence indicates a potentially higher grade
    gold location within the previously defined Gold Zone on the Western side of the
    Intrusion (above the PGE-rich zone);
    • room and pillar mining has been identified as the preferred underground mining
    method for the Skaergaard Project, with operating costs in the GRD Minproc scoping
    study ranging from US$49-81/tonne for a conceptual underground mine development of
    2.4 Mtpa;
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
2.6¢
Change
0.000(0.00%)
Mkt cap ! $16.76M
Open High Low Value Volume
2.6¢ 2.6¢ 2.6¢ $2.108K 81.09K

Buyers (Bids)

No. Vol. Price($)
6 874730 2.5¢
 

Sellers (Offers)

Price($) Vol. No.
2.7¢ 85000 1
View Market Depth
Last trade - 12.06pm 18/09/2025 (20 minute delay) ?
PGM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.