CVN 6.45% 16.5¢ carnarvon energy limited

NS2-D1 Development Well (60% WI & Operator)Pan Orient Energy...

  1. 294 Posts.
    NS2-D1 Development Well (60% WI & Operator)

    Pan Orient Energy Corp.'s (TSX VENTURE:POE) recently drilled Na Sanun East ("NSE") oil field development well NS2-D1 has tested at a maximum rate of 1,920 barrels per day ("bopd") of 35 degree API crude in addition to an average 3% BS&W that is decreasing as the well continues to clean up and unload some of the 7,690 barrels of drilling fluid lost into the target volcanic reservoir during drilling operations. The well was free flowed on a choke setting of 32/64 inch on the annulus and shut-in on the tubing. Flowing casing head pressure is 260 psi and shut in tubing head pressure is 250 psi. Pressure data at various choke settings suggests the well is capable of production at rates much higher than 1,920 bopd.

    Production has been temporarily choked back as a result of limited oil storage capacity. This situation will be rectified shortly and the well will be put on production at rates of between 1,800 and 1,900 bopd. NS2-D1 is the best well drilled to date within the NSE structural closure. All other NSE wells continue to perform above expectation with sustained oil rates and very low water cuts.

    NS2-D1 is a deviated development well, drilled to a true vertical depth ("TVD") of 865 meters, within the southern fault compartment of the NSE oil field between the POE-9 and NS8-D1 wells. The target volcanic reservoir was encountered at a depth of approximately 807 meters TVD penetrating approximately 78 meters (measured thickness) of reservoir section prior to the termination of drilling.

    NS5-D1 Appraisal Well (60% WI & Operator)

    The Aztec #14 is currently drilling ahead at a depth of 554 meters TVD on deviated appraisal well NS5-D1, located within the central fault compartment of the NSE structural closure, 400 meters south of L44-H. Drilling is anticipated to take another 7 to 14 days to completion. This is the second well drilled into NSE's central fault compartment.

    NS6-D1 Development Well (60% WI & Operator)

    The Aztec #7 rig is currently drilling ahead at a depth of 511 meters TVD on deviated development well NS6-D1, located within the south fault compartment of the NSE structural closure approximately 430 meters north of the original POE-9 discovery well. Drilling is anticipated to take 7 to 14 days to completion. This will be the fifth well drilled into NSE's southern fault compartment.
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
(20min delay)
Last
16.5¢
Change
0.010(6.45%)
Mkt cap ! $295.1M
Open High Low Value Volume
15.5¢ 16.5¢ 15.5¢ $201.4K 1.258M

Buyers (Bids)

No. Vol. Price($)
17 888369 15.5¢
 

Sellers (Offers)

Price($) Vol. No.
16.5¢ 1476114 9
View Market Depth
Last trade - 16.10pm 01/11/2024 (20 minute delay) ?
CVN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.