I find it interesting that no one has picked up on the fact that the weight recovery on the detrital sis about 15% therefore the supposed 120m/t resource will only produce circa 18-20 m/t of product.
They will have to mine in excess of a million tonnes of material to fill 1 ship load. Also they will have to dispose of nearly a million tonnes of waste for each shipment which will add significantly to there cost (approx $20 p/t).
And over the life of mine they will have to rehabilitate a main drainage system with a total of 100 million tonnes of waste!!!
FAS Price at posting:
0.4¢ Sentiment: None Disclosure: Unspecified