It took just 2.5 weeks to drill 80 holes with a team of 10!...

  1. 269 Posts.
    It took just 2.5 weeks to drill 80 holes with a team of 10! Wound up in the field last Tuesday. Maximum hole depth was only about 20m, which would indicate no overburden therefore low extraction costs. Holes were drilled 500m apart over a large area of just one zone of interest (only 1 of about 20) in Lake Surprise tenements. Geos will then use the first drill results to isolate the higher grade areas within the broader envelope for infill drilling. Gamma ray logged every hole in API, which can be roughly correlated to other units. As they own 2 of their own drill rigs (value in itself), they will be able to fly through the drill program unhindered. None of this 1 hole per month - more like 5 holes per day. Next few months should be very interesting.
 