It took just 2.5 weeks to drill 80 holes with a team of 10! Wound up in the field last Tuesday. Maximum hole depth was only about 20m, which would indicate no overburden therefore low extraction costs. Holes were drilled 500m apart over a large area of just one zone of interest (only 1 of about 20) in Lake Surprise tenements. Geos will then use the first drill results to isolate the higher grade areas within the broader envelope for infill drilling. Gamma ray logged every hole in API, which can be roughly correlated to other units. As they own 2 of their own drill rigs (value in itself), they will be able to fly through the drill program unhindered. None of this 1 hole per month - more like 5 holes per day. Next few months should be very interesting.
- Forums
- ASX - By Stock
- fast drilling
PKT
pocketmail group limited
It took just 2.5 weeks to drill 80 holes with a team of 10!...
-
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PKT (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online