and.....I forgot to copy this as well from the same release
In addition, many smelting operations recover lead as a valuable by-product from zinc concentrates.This is the case for Glencore’s McArthur River Mine, which produces approximately 400,000 tonnesper annum of zinc concentrate from which both the zinc and lead components are typicallyextracted during the smelting process.
- Forums
- ASX - By Stock
- Fastmarkets MB
and.....I forgot to copy this as well from the same releaseIn...
- There are more pages in this discussion • 106 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)