After reading the latest VIL(25/3) and GGP(7/4) reports, it appears that there is conflicting statements about Fausse Point.
VIL mentioned "prospect development" will be completed before mid year. I think that by this statement VIL means that before mid year, they have rechecked all the data and have prepared the drilling program.
GGP "preparing to drill/sidetrack" in the second or third quarter". By this statement, I think they mean everything is ready to start the drilling.
If the above is correct, our management should let us know what is the latest position.
Why is it taking so long !!!
- Forums
- ASX - By Stock
- VIL
- fausse point position
fausse point position
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)