The things I found most noteable on the annual report were:
Precision object tracking uses for DST outside of robotics.
Package to substantially decrease the cost of DST. That's always a great sign.
Multiple other robotic uses for DST well underway.
No residency lease after current leases are up at Sultana rd. Could not showing continuation be a mere oversight or is it more likely there is a new facility underway? Could the construction works with FBR for tender which were brought to light a few months ago be for works in a new site?
Time to calibrate vision system on HX minimized to 5 minutes (down from 12 hours!).
Automatic recalibration DST.
Through boom delivery system. Other uses apart from HX.
New technology which allows people to work safely inside the operating zone.
- Forums
- ASX - By Stock
- FBR
- FBR General Discussion
FBR General Discussion, page-71
- There are more pages in this discussion • 5,354 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
0.001(4.00%) |
Mkt cap ! $115.4M |
Open | High | Low | Value | Volume |
2.6¢ | 2.6¢ | 2.5¢ | $11.66K | 448.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
25 | 2520567 | 2.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.6¢ | 570044 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
25 | 2520567 | 0.025 |
8 | 1261438 | 0.024 |
7 | 1448041 | 0.023 |
7 | 909632 | 0.022 |
9 | 1886004 | 0.021 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 570044 | 3 |
0.027 | 4167295 | 8 |
0.028 | 4335364 | 7 |
0.029 | 1685337 | 5 |
0.030 | 847500 | 7 |
Last trade - 16.10pm 26/04/2024 (20 minute delay) ? |
|
|||||
Last
2.6¢ |
  |
Change
0.001 ( 1.96 %) |
|||
Open | High | Low | Volume | ||
2.5¢ | 2.6¢ | 2.5¢ | 77669 | ||
Last updated 15.59pm 26/04/2024 ? |
Featured News
FBR (ASX) Chart |