I think based on the blocks proximity to the door of the workshop, one could assume that they are doing builds inside the workshop.
Also, others have noted that it doesn't make sense to double handle blocks that would need to go to site.
- Forums
- ASX - By Stock
- FBR the time is now push the go button
I think based on the blocks proximity to the door of the...
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.4¢ |
Change
-0.001(4.00%) |
Mkt cap ! $111.0M |
Open | High | Low | Value | Volume |
2.4¢ | 2.5¢ | 2.4¢ | $71.31K | 2.967M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
16 | 5230117 | 2.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.4¢ | 45602 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 141607 | 0.024 |
14 | 5160865 | 0.023 |
24 | 3517872 | 0.022 |
9 | 4501871 | 0.021 |
17 | 4849746 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.025 | 3195010 | 13 |
0.026 | 6207292 | 20 |
0.027 | 3044856 | 10 |
0.028 | 5332399 | 9 |
0.030 | 465775 | 6 |
Last trade - 14.10pm 17/06/2024 (20 minute delay) ? |
|
|||||
Last
2.4¢ |
  |
Change
-0.001 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
2.4¢ | 2.4¢ | 2.4¢ | 929178 | ||
Last updated 14.22pm 17/06/2024 ? |
Featured News
FBR (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online