Understand that 8mtpa give optimum scales of economy, so a bigger operation can expect to lower opex further. And with recent discoveries we can look forward to higher production being possible from increasing resources.
Also note 475 mt of lower grade material not included, and, presumably, the deeper carnalite deposits.