FEBRUARY 2012 OPERATIONAL UPDATE
Early results from Fiesta wells confirm viability of Wolfcamp oil production
Highlights from Molopo’s Operational activities during February 2012 include:
Saskatchewan, Canada
• The Estevan 9-22 well had encouraging oil and gas shows in the Midale and Alida intervals
• Two wells flowing back oil with IP rates expected in March
• Two wells undergoing completion operations
Texas, USA
• Molopo’s first three Wolfcamp Horizontal wells are showing positive results on clean-up with maximum oil production rates to date for the three wells being between 50 and 300 bopd per well. Load recovery on the wells is currently between 20% and 32% of total fluid injected
• Early flow results have confirmed the viability of oil production from the Wolfcamp interval and the Company is commencing plans for additional drilling locations in 2012
Oil sales
• Corporate oil sales for the month of January 2012 were 162 bopd (31 day average, net to Molopo), up 30% from the December 2011 average of 125 bopd
Add to My Watchlist
What is My Watchlist?