Railway line between SA and WA has finally been fixed and reopen after 3 weeks of repairs to damage cause by floods, big back log of freight has been held up but expected to get moved quickly with trains up to 1.8 km long. LOL imagine getting caught at a rail way crossing when one of those go past.
I have a pallet of stock that is on that train.
None too soon, supermarket shelves have become bare and I expect it will take 1-2 weeks for shelves to get restocked
- Forums
- Lounge
- Feel Better:Complain About Anything
Feel Better:Complain About Anything, page-80330
Featured News
Featured News
The Watchlist
PTX
PRESCIENT THERAPEUTICS LIMITED
James McDonnell, CEO
James McDonnell
CEO
SPONSORED BY The Market Online