Well long day, rain turned a 4-5 hour job into 8 hours.Got home...

  1. 59,354 Posts.
    lightbulb Created with Sketch. 727
    Well long day, rain turned a 4-5 hour job into 8 hours.

    Got home pulled up a few pavers next to the driveway and dug a hole to reveal the conection of newer water pipe to old pipe that goes under the drive way.

    Next dug a hole at the end of the garage where I new the water pipe would be, grabed some copper water pipe I had in the shed, bugger it's 8 meters so 2 meters short.

    Off to bunning's to get some fittings an more copper pipe, for the life of me could not find the copper pipe. Final found a staff member, he looks it up says they have some but don't know which aisle it's in. After a wait he takes me to the plumbing section and looks where I looked and can't find it, finaly another staff member comes by and he knows where it is. Gees

    Driving home there are cars backed up on this street, Bloody RBT testing every one at the round about and cars backed up in every direction.

    Finally get home, it's getting dark, will leave the temporary plumbing fix till tomorrow. Time for a wine
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.