LNG 0.00% 4.3¢ liquefied natural gas limited

FERC Submittal Construction Schedule, page-15

  1. 1,491 Posts.
    lightbulb Created with Sketch. 23
    rather FERC take their time and be thorough in the approval process than having something rushed through under political pressure.
 
watchlist Created with Sketch. Add LNG (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.