LNG 0.00% 4.3¢ liquefied natural gas limited

The Construction schedule looks as if FID is at the very end of...

  1. 438 Posts.
    lightbulb Created with Sketch. 13
    The Construction schedule looks as if FID is at the very end of 2015. And it looks like production and the very end of 2018. Maybe I'm interpreting it wrong, or maybe that's how it's been.
 
watchlist Created with Sketch. Add LNG (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.