The Construction schedule looks as if FID is at the very end of 2015. And it looks like production and the very end of 2018. Maybe I'm interpreting it wrong, or maybe that's how it's been.
The Construction schedule looks as if FID is at the very end of...
Add to My Watchlist
What is My Watchlist?