3000 tph ore into the concentrator for a bit under 30 tph hmc
200,000 tpa hmc available for msp
By now they should have the msp plant running steadily....vital for tuning up electrostatics circuits, getting the roll speeds and recirculating loads etc sorted.
Concentrator needs to keep delivering 95%hm hmc
The lab recoveries achieved in the testwork will be difficult to replicate in the real world.....good to have a target for the mets though.
Interested to see if they can get 60% of the zircon to premium product as in the lab testwork.
The Fe2O3 max .15% spec will be the decider there.
As long as they get the recovery at the concentrator the mineral missed meeting specs for finished product at the msp should be captured into a saleable middlings product, always a market for that.
kcf
- Forums
- ASX - By Stock
- Fifth shipment
3000 tph ore into the concentrator for a bit under 30 tph...
Featured News
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable
The Watchlist
ATC
ALTECH BATTERIES LTD
Martin Stein, CFO
Martin Stein
CFO
Previous Video
Next Video
SPONSORED BY The Market Online