Below are the key figures for for costs, recovery and production for THR
Production at 2200 tonnes of tungsten.
Profit after cost $360 PER mtu
AROUND A 100 MTU PER TONNE.
100 X 360X 2200 = 79,200,000
MC now 21 mil
at a conservative PE of 3 mc 210 MIL OR 27 CENTS A SHARE
or in HC terms a ten bagger
Key input parameters to the DFS include:
Capital Cost Estimate
A$69 million
Operating Cost estimate (per tonne of ore processed)
A$84
Operating Cost / mtu WO.
After molybdenum bi-product credits
Assuming 75% recovery of WO.
US$115
Revenue / mtu WO.
Source Roskill October 2011. (After APT discounts)
US$360
Annual throughput of ore
400,000 tpa
Tungsten recovery
75%
Molybdenum recovery
77.8%
Scheelite concentrate produced annually
2,200 tpa
Molybdenum concentrate produced annually
1,250MLC
Hope this helps emark put a smile back on your face
- Forums
- ASX - By Stock
- figures and profitability
Below are the key figures for for costs, recovery and production...
-
- There are more pages in this discussion • 73 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add THR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.5¢ |
Change
0.002(15.4%) |
Mkt cap ! $3.469M |
Open | High | Low | Value | Volume |
1.5¢ | 1.5¢ | 1.5¢ | $900 | 60K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 106908 | 1.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.6¢ | 547543 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 106908 | 0.015 |
2 | 239285 | 0.014 |
2 | 935982 | 0.013 |
1 | 90000 | 0.011 |
2 | 400000 | 0.010 |
Price($) | Vol. | No. |
---|---|---|
0.016 | 538462 | 1 |
0.018 | 7000 | 1 |
0.019 | 455400 | 1 |
0.025 | 20526 | 1 |
0.000 | 0 | 0 |
Last trade - 11.55am 04/10/2024 (20 minute delay) ? |
Featured News
THR (ASX) Chart |