Projected commissioning of crushing plant---22 days
aka,
We know from the Townsville Bulletin's report that tenders have been called for construction of the Townsville Port facility.
I do not know what is happening with the Cloncurry multi purpose / multi user rail facility but I assume that is being tendered for as well.
CDU, by bringing in Xstrata and MMG have presumably lowered their rail facility costs.
When these two important projects for the export of CDU'S minerals have been bedded down,CDU will be in a better position to finalise a capex.
Wayne is a great forward planner. He prepares well ahead like the port and rail. That is the way he operates.
- Forums
- ASX - By Stock
- CDU
- final cap x costs and shares on issue
final cap x costs and shares on issue, page-3
-
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CDU (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online