Having read the Beer&Co report it looks as though PLS has one final hurdle to jump - which I believe is going to be another catalyst for the share price (Surly this is yet to be factored into the current price):
PLS is permitted to construct and commission the plant. However, before PLS is able to move product off‐site, it requires a final permit, which follows a site inspection by the Department of Minerals and Energy to assure that the development has been as permitted and is fully permitted. It is now expected that the site inspection will be later in October, with the final permit in November.
- Forums
- ASX - By Stock
- PLS
- Final Permit and site inspection
Final Permit and site inspection
-
- There are more pages in this discussion • 112 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PLS (ASX) to my watchlist
|
|||||
Last
$2.96 |
Change
-0.040(1.33%) |
Mkt cap ! $8.908B |
Open | High | Low | Value | Volume |
$3.01 | $3.02 | $2.93 | $37.13M | 12.56M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 13935 | $2.95 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.96 | 360494 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 13935 | 2.950 |
33 | 222530 | 2.940 |
68 | 794959 | 2.930 |
52 | 576028 | 2.920 |
50 | 317181 | 2.910 |
Price($) | Vol. | No. |
---|---|---|
2.960 | 148421 | 7 |
2.970 | 434909 | 13 |
2.980 | 236131 | 10 |
2.990 | 73443 | 6 |
3.000 | 108112 | 17 |
Last trade - 16.10pm 08/07/2024 (20 minute delay) ? |
Featured News
PLS (ASX) Chart |