AJL 0.00% 0.9¢ aj lucas group limited

Fingers crossed, page-3

  1. 2,910 Posts.
    lightbulb Created with Sketch. 179
    My electrical engineer friend said the problem with grid scale battery storage is they have to store electrical power of wind farm or solar in DC current and then have to convert it back to AC again for grid power line distribution or dispatch. Each time conversion you lose 10-20% of energy and power.
    He thinks the problem of bottle neck effects and efficiency to release power at grid scale rate from battery storage at the moment is the design of modular cells and DC to AC conversion. It may be not possible to have battery storage at scale of GW size which is necessary for backing up excess wind and solar power.

    Very interesting indeed. Learn something new everyday.
    Last edited by tgn01: 24/09/21
 
watchlist Created with Sketch. Add AJL (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
0.000(0.00%)
Mkt cap ! $12.38M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 150000 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 922056 4
View Market Depth
Last trade - 16.12pm 06/09/2024 (20 minute delay) ?
AJL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.