With the PB#1 permit issued it seems that everything is going according to plan. This is a quote from the last quarterly report:
"Paradox Basin #3 been designed for Ismay Production and if successful will establish the completion design required for commercial production from the Ismay Formation, which will then be replicated in sidetracks from the existing two wells, and future production wells."