first 1,300 m hole of 6 planned underway

  1. 255 Posts.
    First diamond drill hole targeting beneath conductor 4
    has commenced.This will be drilled to 1,300-1,400m and will
    take between 3-4 weeks to complete.
    6 to 8 similar deep holes are planned targeting down-dip extensions
    of known high grade mineralisation beneath conductor 4 and 5.
    This is based on a new interpretation of the potential distribution
    of mineralistion within the DeGrussa VMS system based around
    the Shiraz and Merlot fault structures.
    Down hole EM surveys will be undertaken to target accumulations
    of massive sulphides at depth.
 