ZAM has low grade Mn ore and the only way they can make a profit out of it is to build the expensive smelter. This is enough to hold them down for years.
With only $4m to bring this high grade mine into production, the trenching and technical review were seen as sufficient for the start up while a drilling will be carried out based on the mining plan.
- Forums
- ASX - By Stock
- first blast and mining operations underway
ZAM has low grade Mn ore and the only way they can make a profit...
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)