I just viewed the interview with FBR CEO Mike PIvac on'Your MoneyI was very impressed with the content of the interview, the Hadrian Xwas operating at 1/4 of design speed (test speed) for their first build (constructed in the factory unit) The total build time was 60 hours (including filming time)The actual brick laying time was 40 hours.
Which equates to a potential 10 hour build time for each 3x2!!!!
He mentioned that last week they met with some representatives from Europe regarding new industries for the DST technology.
Exciting times ahead.
- Forums
- ASX - By Stock
- FBR
- First Build (in factory) was completed at 1/4 of design speed.
First Build (in factory) was completed at 1/4 of design speed.
- There are more pages in this discussion • 129 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
-0.001(1.96%) |
Mkt cap ! $115.4M |
Open | High | Low | Value | Volume |
2.6¢ | 2.6¢ | 2.5¢ | $1.868K | 73.29K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
19 | 1018721 | 2.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.6¢ | 761478 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
19 | 1018967 | 0.025 |
10 | 2410575 | 0.024 |
4 | 773955 | 0.023 |
6 | 836179 | 0.022 |
9 | 1868815 | 0.021 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 761478 | 6 |
0.027 | 4701932 | 11 |
0.028 | 4017864 | 6 |
0.029 | 1185337 | 4 |
0.030 | 847500 | 7 |
Last trade - 12.31pm 02/05/2024 (20 minute delay) ? |
|
|||||
Last
2.6¢ |
  |
Change
-0.001 ( 2.00 %) |
|||
Open | High | Low | Volume | ||
2.5¢ | 2.6¢ | 2.5¢ | 60418 | ||
Last updated 12.15pm 02/05/2024 ? |
Featured News
FBR (ASX) Chart |
The Watchlist
BPH
BPH ENERGY LTD
David Breeze, MD & Executive Chairman
David Breeze
MD & Executive Chairman
Previous Video
Next Video
SPONSORED BY The Market Online