Well you toxic followers would remember Callide B. Still not operating at all.In October 2019, Federal Energy Minister Angus Taylor announced that Callide B's originally planned 2038-39 closure was being brought forward to 2028.
- Forums
- Political Debate
- First copper-plated solar panel hits production line
First copper-plated solar panel hits production line, page-38
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)