Coban C has sequences of anhydrite and dolomite which are all hard to drill (just softer than granite basement). We can't guess how fast they are drilling but no doubt that the trailer mounted rig has limited capacity and can't be as fast as a full size one. Atzam-4 has C13 at circa 1700 ft so it has been the number we heard of most accurate so far. It's almost a week so hope we are getting there.
- Forums
- ASX - By Stock
- ETR
- first oil show estimate
first oil show estimate, page-2
-
- There are more pages in this discussion • 44 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ETR (ASX) to my watchlist
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.88M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ETR (ASX) Chart |
Day chart unavailable