VMS 5.26% 1.8¢ venture minerals limited

First Shipment, page-355

  1. 730 Posts.
    lightbulb Created with Sketch. 157
    The likelihood is, that when the shed(s) are filled to capacity, which looks to be near a boatload, then when a ship is being loaded, the built-up stockpile at campsite can immediately replenish space during ship loading. Sure the contractors have it all worked out. No holdups foreseen, unless there is something we don't know. Announcements will fill in the gaps.
 
watchlist Created with Sketch. Add VMS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.