Interesting - 123 metres of coil tubing as per 19 January release remaining and now down to 38 metres.
That 123 metres was reported while fishing operations had stopped with the pressure issue.
If the current release is stating well pressure is under control and they have already retrieved 70% of the tubing in quick time - that sounds good.
Of more difficulty will no doubt be getting the milling tool - but at least they are onto it!
Add to My Watchlist
What is My Watchlist?