"Other Operations at Redcliffe Gold Project • A round of deeper RC drilling has been completed at the Nambi Pit, for which results are being processed and plotted.
• Drilling of several pre-collars was carried out in December in preparation for diamond core drilling at Nambi Pit scheduled for January 2008 designed to test the lode at even greater depth." (
• Additional RC holes were drilled at West lode and Redcliffe Pit Prospects.
• Detailed geological mapping has continued over the Nambi/Redcliffe prospect areas.
• Channel sampling of accessible pit wall exposures has been carried out at Nambi Pit, Nambi South Pit, and Mesa Pit."
September Qtrly report - fosterville JV (PRE 25%)
"drilling recommenced in September testing the northern extension to the Main-Lees, Palmer & McPhee Trends with 2,062 metres drilled in 14 holes. All but two holes sampled basement which was intersected at depths ranging from 110 to 124 metres. Assay results from this drilling are pending."
PRE Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held