Further to its Stock Exchange Release on 5 September 2006, ROC advises the Dana-operated Flamant-1 exploration well in Block 8 has reached a depth of 2,035 metres Below Rotary Table (¡°mBRT¡±) and the 13¨ü inch casing has been run and set to a depth of 2,030 mBRT. As at 0600 hours (local time) on 11 September 2006, the current operation was preparing to drill ahead in 12¨ù inch hole to the planned Total Depth of approximately 3,370 mBRT.
Flamant-1 is located in a water depth of 1,414 metres approximately 340 km north-west of the Chinguetti Oil Field.
On completion of Flamant-1, the Atwood Hunter will drill a second Dana-operated exploration well, Aigrette-1 in Block 7, before returning the rig to Woodside.
- Forums
- ASX - By Stock
- HDR
- flamant update
HDR
hardman resources limited
flamant update
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HDR (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Chairman
Nick Poll
Executive Chairman
Previous Video
Next Video
SPONSORED BY The Market Online