Does anyone have a rough idea on the opex per tonne and capex for an Oz based Chalcopyrite crush/grind and floatation circuit?
Throughput about 1Mtpa and host rock is a reasonable weak porphyry
- Forums
- General
- floatation costs
Does anyone have a rough idea on the opex per tonne and capex...
Featured News
Featured News
The Watchlist
3DA
AMAERO LTD
Hank Holland, Chairman and CEO
Hank Holland
Chairman and CEO
Previous Video
Next Video
SPONSORED BY The Market Online