It will be announced when it is shipped then 10 weeks of travel ... early August to site.
I also don't think the American truck bodies have left the US ... they should send one to Perth and two to Leiber in Florida... the boom sections for the USA machines can be shipped from Perth and assembled in Florida.
I can see a huge ramp up in production in September once HX110 is shown to USA investors... then we need to asseble an Oz truck for Brickworks or whoever WaaS partner ... comes on board for Australia
- Forums
- ASX - By Stock
- Florida Builds
It will be announced when it is shipped then 10 weeks of travel...
-
-
- There are more pages in this discussion • 189 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.6¢ |
Change
0.001(2.22%) |
Mkt cap ! $221.9M |
Open | High | Low | Value | Volume |
4.6¢ | 4.9¢ | 4.5¢ | $387.1K | 8.299M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 315279 | 4.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.7¢ | 221109 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 315279 | 0.046 |
15 | 852119 | 0.045 |
6 | 638488 | 0.044 |
7 | 551192 | 0.043 |
8 | 942829 | 0.042 |
Price($) | Vol. | No. |
---|---|---|
0.047 | 210477 | 1 |
0.048 | 63340 | 1 |
0.049 | 752000 | 4 |
0.050 | 884463 | 4 |
0.051 | 371342 | 5 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
FBR (ASX) Chart |