VIL verus investments limited

This is interesting from KOKO on the ADX threadFlow rates in the...

  1. 1,477 Posts.
    lightbulb Created with Sketch. 1

    This is interesting from KOKO
    on the ADX thread
    Flow rates in the area

    The 1 El Ain, drilled in 1982 about 2 1/2 km southwest of 1 Gremda, encountered 29.5 m of net Bireno pay at 2,570 m. A long term test flowed 2,550 b/d of 40 gravity oil and 1.2 MMcfd of gas.

    These discoveries were left undeveloped due to low oil and gas prices in the late 1980s, and consequently the Bireno carbonates remained a secondary target until 1 El Ain was brought on production.

    Encouraged by the good performance of the reservoir, British Gas upgraded again the Bireno carbonates as a primary target and drilled 1 Rhemoura. The well, situated 5 km southeast of 1 El Ain, reached the top of Bireno at 2,873 m and encountered a net pay of 53 m that tested 7,600 b/d of 35 gravity oil.

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.