NWE 0.00% 5.6¢ norwest energy nl

flow rate guesses, page-63

  1. 13,038 Posts.
    lightbulb Created with Sketch. 788
    DiceMan/Pottermore:
    DiceMan: Agree that a perhaps better "guesstimates" competition would be "WHEN we have flow results to market".
    Pottermore: Your post ("first lot of flow rates are not far away")IMPLIES that NWE will report not on a "Stage by Stage" basis but combined results??
    My understanding - rightly or wrongly!! - was that each stage would be checked one by one and the results reported one by one. So, according to my (mis-?)understanding, NWE are firstly (now) checking
    Lower Kockatea (Stage 5) both for gas and oil
    Results I would expect still sometime during December
    Thereafter in order:
    Middle Carynginia (Stage 4) Results by ???
    Lower Carynginia (Stage 3) Results by ???
    Upper Irwin River (Stage 2) Results by ???
    Lower Irwin River/HCSS (Stage 1) Results by ???
    Personally, I would assume that checking of the Stage 4 to Stage 1 process could easily take until March (or even later?) next year.
    And, thereafter, a seismic program has been proposed. This naturally will also take quite some time.
    So, a lot of patience will be needed IMHO.
    Comments most welcome.
    wasa
 
watchlist Created with Sketch. Add NWE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.