There's your answer from Molopo's Updated Website
Flow back of the load fluid commenced 28 September 2012 (North America), but the very large volumes of fluid that were utilized in the completion of this well are expected to require several weeks to extract. Due to this, well results with hydrocarbon indications are anticipated through November 2012.