yer checked that and read OEL reports twice to see planned drill was about 2190 vertical and 2000 metres horizontal. Since the final length was 3,958 metres there was a 132 metre shortening. Another announcement has a 4,466m total drill giving a 508m shortening. These guys are going to use the word 'about' because they need to modify the plan to suit the drilling data on the day. My take on the situation is 260m of very high quality sst will drain in all oil from the formation (without coning) to the production liner so the 500m max shortening will not be an issue.
- Forums
- ASX - By Stock
- flow rates
yer checked that and read OEL reports twice to see planned drill...
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NDO (ASX) to my watchlist
(20min delay)
|
|||||
Last
81.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $184.7M |
Open | High | Low | Value | Volume |
0.0¢ | 82.0¢ | 80.0¢ | $250.3K | 309.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 12308 | 81.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
83.0¢ | 38521 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 12308 | 0.810 |
1 | 10000 | 0.800 |
1 | 5000 | 0.780 |
1 | 663 | 0.755 |
1 | 10000 | 0.700 |
Price($) | Vol. | No. |
---|---|---|
0.830 | 38521 | 3 |
0.880 | 2000 | 1 |
0.900 | 15000 | 1 |
0.950 | 9500 | 2 |
0.970 | 10000 | 1 |
Last trade - 16.15pm 01/11/2024 (20 minute delay) ? |
Featured News
NDO (ASX) Chart |
Day chart unavailable