This is is my guesswork after reading a few GDY annoncements.
GDY were roughly producing 1.5 times this flow rate and estimated it was good enough for a 15mw power plant.
If the flow rate is not enough GRK can significantly improve it through fracture stimulation.
The real question is what the temperature of the water is as i imagine it will be many times lower than that encountered by GDY.
Cheers
Add to My Watchlist
What is My Watchlist?