FLC fluence corporation limited

I believe this is another of our Aspiral deployment in Zhejiang...

  1. 864 Posts.
    lightbulb Created with Sketch. 1222
    I believe this is another of our Aspiral deployment in Zhejiang Province, Hangzhou, West Lake (Xihu) region and a demonstration of how a wastewater treatment plant can be incorporate into an Ecological Park. Should be completed by end of this month.

    http://www.hzxh.gov.cn/art/2021/10/8/art_1177934_59013448.html


    The construction of the pilot project of "zero direct discharge village" for rural domestic sewage treatment in Hubu Village, Shuangpu Town started construction
    Information source: District Housing and Urban-rural Development BureauRelease time: 2021-10-08 12:49Browse volume:17Font: [DaZhongsmall]

    Focusing on the construction of the "zero direct discharge village" for domestic sewage treatment in rural areas, the "full collection of sewage, full separation of rain and sewage, full treatment up to standards, full utilization of resources, and full supervision of wisdom" five requirements, Hubu Village, Shuangpu Town, "zero direct discharge village" "The construction project has been started recently.

    https://hotcopper.com.au/data/attachments/3668/3668233-bf46ee13b23d8f725627510f7080a4ea.jpg

    With the start of the Tongjian Lake flood control and drainage water conservation ecological restoration project in 2019, the original five sewage facilities in Hubu Village, Shuangpu Town are facing the situation of being abandoned and demolished.In order to properly dispose of the daily water consumption of farmers in the village, and to welcome the increase in the business of catering and farmhouses that may be brought about by the completion of the Tongjian Lake Ecological Park.In 2020, Shuangpu Town initiated and implemented the upgrading and renovation project of rural domestic sewage treatment facilities in Hubu Village.The original five facilities will be merged and integrated into a facility terminal with a daily processing capacity of 300T.

    https://hotcopper.com.au/data/attachments/3668/3668235-754f369e49fbdb8ab131b0a2d37f5f88.jpg

    The terminal facility pilot uses a new process technology, Aerated Membrane Bioreactor (MABR). The process has the characteristics of stable effluent reaching the standard, simple operation and maintenance, and long service life.The landscape design of the facility terminal meets the overall landscape requirements of the Tongjian Lake Ecological Park, creating an organic combination of ecological gardens and courtyard landscapes.At the same time, the facility terminal is equipped with equipment such as flow meters, monitoring and water quality online detection, which can monitor the operating status of the facility in real time.After the project has undergone continuous and stable operation and maintenance, it has been officially handed over to a third-party operation and maintenance company to carry out long-term operation and maintenance management.At present, the terminal facilities are operating normally, and the effluent quality has reached the provincial first-level effluent standard.

    https://hotcopper.com.au/data/attachments/3668/3668237-d5f70fad6be3f831d57bd3e4d6ba60d7.jpg

    At present, the officially implemented "zero direct drainage village" project is carrying out front-end facilities replenishment, pipe network repair, etc., and it is expected to be completed before the end of October.

    https://hotcopper.com.au/data/attachments/3668/3668239-3898bcc0717e101cfb34199e6955c812.jpg


    Last edited by jamesc666: 09/10/21
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
4.1¢
Change
0.005(13.9%)
Mkt cap ! $44.49M
Open High Low Value Volume
3.7¢ 4.5¢ 3.7¢ $158.3K 3.729M

Buyers (Bids)

No. Vol. Price($)
2 109465 4.1¢
 

Sellers (Offers)

Price($) Vol. No.
4.2¢ 250000 1
View Market Depth
Last trade - 15.44pm 20/06/2025 (20 minute delay) ?
FLC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.